3. Setup your flow

Setup your prototype flow by following the same steps as the previous section.

  1. Add flow starting point

  2. Connect top-level frames

  3. Set after-delay trigger

  4. Set navigate-to action

Click on the related links below to return to the detailed instructions provided in previous section.

1️⃣ Add flow starting point

Related: Add flow starting point

2️⃣ Connect top-level frames

Related: Connect top-level frames

3️⃣ Set after-delay trigger

Related: Set after-delay trigger

4️⃣ Set navigate-to action

Related: Set navigate-to action